Page cover

🏨Buildings

Own & rent!

Building NFTs are player-owned digital assets used for Hora Miners placement. By placing a Hora Miner into a Building, the process of mining our premium currency - Hora Coin ($HCOIN) is being set.

Buildings will be distributed into 6 zones, divided by their exclusivity:

  • Start-up Zone

  • Industrial Zone

  • Urban Zone

  • Economy Zone

  • Business Zone

  • Central Zone

Each zone will differ in the general outlook and output. Start-up Zone will be the low-end zone, and the Central Zone will be the most exclusive one, with the best output, better options within the building, and with the best-looking buildings.

Within Buildings, there will be certain spots to place Hora Miners. Building owners can rent those spots to Hora Miner owners.

Also, the whole interior of the Building will be customizable, and this option will be introduced in the later stages of the development.

Buying & Selling on the Marketplace

The Buildings will be obtainable by joining a special pre-sale which will be introduced in phases by Hora Games. After that, these NFTs will be available on the marketplace from other holders.

The first pre-sale will consist of 10-20% of all Building NFTs, more details will be presented as we reach certain stages.

Building Stats

Buildings will have the following stats:

  • Number of floors

  • Number of miners per floor

  • Power Output Capacity

  • Cooling Efficiency

Number of floors

Depends on the Zone of the acquired Building, each Building will have different floors with different miner capacities. For instance, Start-up Zone Building will have a single floor, with 20 miner spots, while the Central Zone Building will have 8-10 floors with 3000 miner spots in total.

Please keep in mind, that these figures are still not exact, and are subject to changes.

Power output capacity

Represents the total amount of kilowatt-per-hour (kW/h) the building can provide. If the power capacity is breached, the miners will lose power, and occasionally reset.

This will reduce the efficiency of the Hora Miners since their uptime will not be constant, and at the time of restart, they will not mine. The more power is used over the threshold, Miners resets will happen more often.

Power output capacity will offer great potential for balancing Buildings with different types of Miners, in order to use the maximum power-to-hash rate value.

Cooling efficiency

Will be directly tied to the miner overclock multiplier. A Hora Miner with a high overclock multiplier will have a better hash rate in Buildings with higher cooling efficiency, but will also increase the power consumption of a Hora Miner.

This gives an opportunity to the Building owners to optimize their mining efficiency accordingly, by setting lower/higher application parameters for miner owners which are interested in renting a miner spot, tweaking the splitting percentage between the miner owners and Building owner, etc.

The effectiveness of the Building will depend greatly on the proficiency and creative management of owners/managers.

Building Items

Building items will be craftable NFTs that work in conjunction with Buildings that can bump up the efficiency of the building.

They will be introduced with the second building pre-sale, as we enter certain phases, more features will be introduced.

Last updated

Was this helpful?